Pipeline Design Specifications:
The pipeline is designed in accordance with the relevant sections of ASME B31.4/B31.8, as applicable, supplemented by this document.
The pipeline is designed taking into consideration the design and operating conditions and requirements over its entire projected life cycle including final abandonment, the characteristics of the fluids to be transported, the pressure and temperature requirements, the mode of operations, the geographic location, and the environmental conditions.
๐๐๐ฆ๐๐๐ก ๐ฃ๐๐๐๐ข๐ฆ๐ข๐ฃ๐๐ฌ ๐๐ก๐ ๐ข๐ฃ๐๐ฅ๐๐ง๐๐ก๐ ๐ฅ๐๐ค๐จ๐๐ฅ๐๐ ๐๐ก๐ง๐ฆ:
โ๏ธ ๐ฃ๐๐ฃ๐๐๐๐ก๐ ๐๐๐ฆ๐๐๐ก
โ
Bends
โ
Valves
โ
Branch Connection and Fittings
โ
Pigging of Buried Pipelines
โ
Testing and Pre-Commissioning
โ๏ธ ๐๐๐ฆ๐๐๐ก ๐๐๐ง๐
โ
Design Life
โ
General and Environment Data
โ
Terrain and Geology
โ
Pipeline Category
โ๏ธ ๐ฅ๐ข๐จ๐ง๐๐ก๐
โ
Route Survey
โ
Buried Pipelines
โ
Aboveground Pipelines
โ
Establishment of Location Classes
โ๏ธ ๐ฃ๐๐ฃ๐๐๐๐ก๐ ๐ ๐๐๐๐๐ก๐๐๐๐ ๐๐๐ฆ๐๐๐ก
โ
Hoop Stress Design Factor
โ
Pipeline Wall Thickness
โ
Stress Analysis
โ
Minimum Elastic Bend Radius
โ
Road | Rig | Track Crossing Calculation
โ
Additional Consideration
โ
Pipeline Transition at Above ground โ Below ground
โ
Upheaval Buckling Analysis
โ
On โ bottom Stability of Pipelines
โ
Pipeline Burial Depth
โ๏ธ ๐ฃ๐๐ฃ๐๐๐๐ก๐ ๐๐ฅ๐ข๐ฆ๐ฆ๐๐ก๐๐ฆ
โ
Buried Crossing
โ
Aboveground Crossing
โ๏ธ ๐ฃ๐๐ฃ๐๐๐๐ก๐ ๐๐ข๐ ๐ฃ๐ข๐ก๐๐ก๐ง
โ
Line Pipe
โ
Barred Tees
โ
Flanges
โ
Pig Signaler
โ
Isolating Joints
โ๏ธ ๐๐ข๐ฅ๐ฅ๐ข๐ฆ๐๐ข๐ก ๐ฃ๐ฅ๐ข๐ง๐๐๐ง๐๐ข๐ก
โ
External Corrosion Coating Requirement
โ
Field Joint Coating
โ
Cathodic Protection
โ
Internal Corrosion
โ๏ธ ๐ฃ๐๐ฃ๐๐๐๐ก๐ ๐ช๐๐๐๐๐ก๐ & ๐ก๐๐ง
โ๏ธ ๐ฃ๐ฅ๐๐ฆ๐ฆ๐จ๐ฅ๐ ๐ง๐๐ฆ๐ง๐๐ก๐
โ๏ธ ๐ฃ๐ฅ๐-๐๐ข๐ ๐ ๐๐ฆ๐ฆ๐๐ข๐ก๐๐ก๐
โ๏ธ ๐ฃ๐ฅ๐๐ฆ๐๐ฅ๐ฉ๐๐ง๐๐ข๐ก ๐ข๐ ๐ฃ๐๐ฃ๐๐๐๐ก๐
โ๏ธ ๐ฃ๐๐ฃ๐๐๐๐ก๐ ๐ ๐๐ฅ๐๐๐ฅ๐ฆ
โ๏ธ ๐ฃ๐๐๐๐๐ก๐ ๐๐๐ฆ๐๐๐๐ก๐ ๐ฆ๐จ๐ฅ๐ฉ๐๐ฌ
Pipeline Construction Specifications:
โ๏ธ ๐๐ก๐๐๐ก๐๐๐ฅ๐๐ก๐ & ๐๐ข๐ก๐ฆ๐ง๐ฅ๐จ๐๐ง๐๐ข๐ก ๐๐ข๐ก๐ฆ๐๐๐๐ฅ๐๐ง๐๐ข๐ก
โ๏ธ ๐ฅ๐๐๐๐ง โ ๐ข๐ โ ๐ช๐๐ฌ | ๐ฅ๐ข๐ช
โ
Fence and Barriers
โ
Removal of Debris
โ
Grading of ROW
โ
Provision of Diversions
โ
Access to ROW
โ๏ธ ๐๐๐ก๐๐๐๐ก๐, ๐๐๐จ๐๐๐ก๐, ๐ฆ๐ง๐ฅ๐๐ก๐๐๐ก๐ ๐๐ก๐ ๐ฆ๐ง๐ข๐ฅ๐๐๐
โ
Handling of Pipes and Fittings
โ
Hauling and Stringing of Pipes
โ
Damaged Pipes
โ๏ธ ๐ง๐ฅ๐๐ก๐๐๐๐ก๐
โ
Trenching
โ
Minimum Cover Requirements for Buried Pipeline
โ
Extra Depth and Clearances
โ
Protection of Underground Utilities
โ
Grading, Padding and Finish Trench
โ
Protection of Trench and Boring Pits
โ๏ธ ๐ฃ๐๐ฃ๐ ๐๐๐ก๐๐ฆ
โ
Elastic Bends
โ
Cold Field Bends
โ
Miter Bends
โ๏ธ ๐๐๐ก๐๐ก๐ ๐จ๐ฃ
โ
Care of Pipe
โ
Pipe Defect and Repair
โ
Swabbing, Pipe Beveling and Cleaning Ends of Joints
โ
Pipe Handling and Skid Supports
โ
Night Caps
โ๏ธ ๐ฆ๐ฃ๐๐๐๐๐ ๐๐ฅ๐ข๐ฆ๐ฆ๐๐ก๐ | ๐ฅ๐ข๐๐ ๐๐ฅ๐ข๐ฆ๐ฆ๐๐ก๐๐ฆ
โ
Minor | Graded Road | Track Crossings
โ
Major Crossing and Asphalt Road Crossings
โ
Buried Pipelines Crossing Other Buried Services
โ๏ธ ๐ง๐๐ โ ๐๐ก๐ฆ
โ
Tie โ In to New Pipeline
โ
Method for Tie โ In of Pipeline
โ
Tie โ In of Pipelines in Trench
โ
Tie โ In of Aboveground Flowlines
โ
Pipe Pups
โ
Fitting and Equipments
โ
Pressure Tested Sections
โ๏ธ ๐ช๐๐๐๐๐ก๐ | ๐๐๐๐ฅ๐๐๐๐ง๐๐ข๐ก ๐ข๐ ๐๐ฆ๐ฆ๐ ๐๐๐๐๐๐ฆ
โ
Fabrication and Testing
โ
Small Diameter Ancillary Connections to Pipeline
โ
Protection of the Pre-fabricated Assemblies
โ๏ธ ๐๐๐๐๐ ๐๐ข๐๐ก๐ง ๐๐ข๐๐ง๐๐ก๐
โ
Care in Handling Coated Pipes
โ
Holiday Detection and Damaged Coating Repair
โ๏ธ ๐๐ข๐ช๐๐ฅ๐๐ก๐ โ ๐๐ก ๐ข๐ ๐ฃ๐๐ฃ๐
โ
Method and Time of Lowering โ In Pipe
โ
Lowering โ In of Slack Loops
โ๏ธ ๐๐๐๐๐๐๐๐๐๐ก๐
โ
Selected Backfill Materials and Padding
โ
Stabilization of Backfill
โ๏ธ ๐ ๐๐ฅ๐๐๐ฅ๐ฆ
โ๏ธ ๐๐๐ง๐๐ข๐๐๐ ๐ฃ๐ฅ๐ข๐ง๐๐๐ง๐๐ข๐ก (๐๐ฃ) | ๐๐ก๐๐ง๐๐๐ ๐ฅ๐๐ค๐จ๐๐ฅ๐๐ ๐๐ก๐ง
โ
Baseline CP โ Survey
โ๏ธ ๐๐๐๐ ๐ฉ๐ข๐๐ง๐๐๐ ๐ฆ๐ฌ๐ง๐๐ ๐ฆ ๐๐ก๐๐๐จ๐๐ก๐๐๐ฆ ๐๐จ๐ฅ๐๐ก๐ ๐๐ข๐ก๐ฆ๐ง๐ฅ๐จ๐๐ง๐๐ข๐ก
โ
Additional Measures to Work
โ๏ธ ๐๐๐ ๐๐ง๐๐ง๐๐ข๐ก ๐ข๐ ๐ช๐ข๐ฅ๐ ๐ฆ๐ฃ๐ฅ๐๐๐
โ๏ธ ๐๐ฌ๐๐ฅ๐ข๐ฆ๐ง๐๐ง๐๐ ๐ง๐๐ฆ๐ง ๐ฃ๐ฅ๐ข๐๐๐๐จ๐ฅ๐
โ๏ธ ๐ฃ๐๐ฃ๐๐๐๐ก๐ ๐ฃ๐ฅ๐ โ ๐๐ข๐ ๐ ๐๐ฆ๐ฆ๐๐ข๐ก๐๐ก๐ ๐๐ก๐ ๐๐ข๐ ๐ ๐๐ฆ๐ฆ๐๐ข๐ก๐๐ก๐
โ๏ธ ๐๐ข๐ก๐ฆ๐ง๐ฅ๐จ๐๐ง๐๐ข๐ก ๐ข๐ ๐๐๐ข๐ฉ๐ ๐๐ฅ๐ข๐จ๐ก๐ ๐๐ก๐ฆ๐ง๐๐๐๐๐ง๐๐ข๐ก๐ฆ
โ
Painting of Above Ground Work
โ
Extent of Coating at Interface Between U/G and A/G
โ
Installation of Isolating Joints
โ๏ธ ๐๐ข๐ก๐ฆ๐ง๐ฅ๐จ๐๐ง๐๐ข๐๐ก ๐๐ข๐๐จ๐ ๐๐ก๐ง๐ฆ
โ๏ธ ๐๐ฆ โ ๐๐จ๐๐๐ง ๐๐ฅ๐๐ช๐๐ก๐ ๐๐ก๐ ๐ฃ๐๐ฃ๐ ๐๐ข๐ข๐
โ
Equipment Nameplates
โ
Pipe Book
โ๏ธ ๐ ๐๐ง๐๐ฅ๐๐๐ ๐๐๐๐ก๐ง๐๐๐๐๐๐ง๐๐ข๐ก
โ๏ธ ๐ฃ๐๐ฃ๐๐๐๐ก๐ ๐๐ข๐ก๐ฆ๐ง๐ฅ๐จ๐๐ง๐๐ข๐ก ๐๐๐๐๐ ๐๐๐ฆ๐ง
Documentation: Pipeline Construction Projects
Prior to and during construction operations, following construction documentation for Company review/ approval.
โ๏ธ ๐ฃ๐ฒ๐ฟ๐บ๐ถ๐ ๐ฎ๐ฝ๐ฝ๐น๐ถ๐ฐ๐ฎ๐๐ถ๐ผ๐ป๐ ๐ฎ๐ป๐ฑ/ ๐ผ๐ฟ ๐ฎ๐ฝ๐ฝ๐ฟ๐ผ๐๐ฎ๐น๐
โ๏ธ ๐๐ฎ๐น๐ฐ๐๐น๐ฎ๐๐ถ๐ผ๐ป๐ ๐ณ๐ผ๐ฟ ๐๐ฒ๐บ๐ฝ๐ผ๐ฟ๐ฎ๐ฟ๐ ๐๐ผ๐ฟ๐ธ๐, ๐ฏ๐๐ผ๐๐ฎ๐ป๐ฐ๐, ๐ฒ๐๐ฐ.
โ๏ธ ๐๐ผ๐ป๐๐๐ฟ๐๐ฐ๐๐ถ๐ผ๐ป ๐ฑ๐ฟ๐ฎ๐๐ถ๐ป๐ด๐.
โ๏ธ ๐ ๐ฒ๐๐ต๐ผ๐ฑ ๐ฆ๐๐ฎ๐๐ฒ๐บ๐ฒ๐ป๐๐ ๐ณ๐ผ๐ฟ ๐๐ต๐ฒ ๐ณ๐ผ๐น๐น๐ผ๐๐ถ๐ป๐ด ๐ฎ๐ฐ๐๐ถ๐๐ถ๐๐ถ๐ฒ๐:
โ
Pre-Construction Survey
โ
Clearing and Grading of ROW
โ
Pipe Handling, Storage, Hauling and Stringing
โ
Cold Bending
โ
Lining Up and Welding
โ
Field Joint Coating
โ
Holiday Detection
โ
NDT
โ
Upheaval/ Lateral buckling check
โ
Trench Excavation and Padding
โ
Pipeline Lowering-in
โ
Backfilling and Berming
โ
Tie-ins and Hot Taps
โ
Special Crossings
โ
Auger Bore
โ
Thrust Bore
โ
Pipework Fabrication and Installation of Appurtenances
โ
Cathodic Protection Facilities
โ
Management of water (obtaining water, re-use and disposal)
โ
As-built Survey
โ๏ธ ๐ฃ๐ฟ๐ผ๐ฐ๐ฒ๐ฑ๐๐ฟ๐ฒ๐ ๐ณ๐ผ๐ฟ ๐๐ต๐ฒ ๐ณ๐ผ๐น๐น๐ผ๐๐ถ๐ป๐ด ๐ผ๐ฝ๐ฒ๐ฟ๐ฎ๐๐ถ๐ผ๐ป๐:
โ
Padding ยง Backfilling ยง Welding & Inspection
โ
Cleaning, Gauging and Hydrostatic Testing
โ
Pre – Commissioning
โ
Preservation of pipeline (if required by Company)
โ
Commissioning
โ๏ธ ๐ฅ๐ฎ๐ฑ๐ถ๐ผ๐ด๐ฟ๐ฎ๐ฝ๐ต๐ ๐๐ฒ๐น๐ฑ ๐บ๐ฎ๐ฝ๐
โ๏ธ ๐ฃ๐ถ๐ฝ๐ฒ ๐ฎ๐ป๐ฑ ๐๐ฒ๐น๐ฑ๐ถ๐ป๐ด ๐ฏ๐ผ๐ผ๐ธ
โ๏ธ ๐ก๐๐ง ๐ฟ๐ฒ๐ฝ๐ผ๐ฟ๐๐ (๐ฅ๐ฎ๐ฑ๐ถ๐ผ๐ด๐ฟ๐ฎ๐ฝ๐ต๐, ๐จ๐น๐๐ฟ๐ฎ๐๐ผ๐ป๐ถ๐ฐ ๐ฎ๐ป๐ฑ ๐ ๐ฃ๐).
โ๏ธ ๐ ๐ฎ๐๐ฒ๐ฟ๐ถ๐ฎ๐น ๐๐ฒ๐๐ ๐ฟ๐ฒ๐๐๐น๐๐ (๐ฐ๐ผ๐ฎ๐๐ถ๐ป๐ด, ๐๐ฒ๐น๐ฑ๐ถ๐ป๐ด, ๐ฝ๐ฎ๐ถ๐ป๐๐ถ๐ป๐ด, ๐ฒ๐๐ฐ.)
โ๏ธ ๐ ๐ฎ๐๐ฒ๐ฟ๐ถ๐ฎ๐น ๐๐ฒ๐ฟ๐๐ถ๐ณ๐ถ๐ฐ๐ฎ๐๐ฒ๐, ๐ ๐ฎ๐๐ฒ๐ฟ๐ถ๐ฎ๐น ๐ฅ๐ฒ๐ฐ๐ฒ๐ถ๐ฝ๐๐, ๐ฒ๐๐ฐ.
โ๏ธ ๐ฉ๐ฒ๐ป๐ฑ๐ผ๐ฟ ๐ฑ๐ฟ๐ฎ๐๐ถ๐ป๐ด๐
โ๏ธ ๐๐ผ๐บ๐ฝ๐๐๐ฒ๐ฟ๐ถ๐๐ฒ๐ฑ ๐ฝ๐ผ๐๐ฒ๐ป๐๐ถ๐ฎ๐น ๐น๐ผ๐ด๐ด๐ถ๐ป๐ด ๐๐ฒ๐๐ ๐ฟ๐ฒ๐๐๐น๐๐
โ๏ธ ๐ค๐ ๐ฅ๐ฒ๐น๐ฒ๐ฎ๐๐ฒ ๐๐ฒ๐ฟ๐๐ถ๐ณ๐ถ๐ฐ๐ฎ๐๐ฒ ๐ณ๐ผ๐ฟ ๐๐๐ฑ๐ฟ๐ผ๐๐๐ฎ๐๐ถ๐ฐ ๐ง๐ฒ๐๐.
In addition to weekly and monthly progress report as per the AGREEMENT requirements, Daily basis the following reports, but not limited to:
โ๏ธ ๐ฆ๐ฒ๐ฝ๐ฎ๐ฟ๐ฎ๐๐ฒ ๐ฃ๐ฟ๐ผ๐ด๐ฟ๐ฒ๐๐ ๐ฟ๐ฒ๐ฝ๐ผ๐ฟ๐ ๐ผ๐ณ ๐ฎ๐น๐น ๐ฐ๐ฟ๐ฒ๐๐.
โ๏ธ ๐๐ฎ๐ถ๐น๐ ๐๐ฒ๐น๐ฑ๐ถ๐ป๐ด ๐ฟ๐ฒ๐๐๐น๐๐, ๐ฟ๐ฒ๐ฝ๐ฎ๐ถ๐ฟ ๐ฎ๐ป๐ฑ ๐ก๐๐ง ๐ฟ๐ฒ๐๐๐น๐๐
โ๏ธ ๐ ๐ฎ๐๐ฒ๐ฟ๐ถ๐ฎ๐น ๐ฅ๐ฒ๐ฐ๐ฒ๐ถ๐ฝ๐
โ๏ธ ๐๐ฎ๐บ๐ฎ๐ด๐ฒ๐
โ๏ธ ๐๐ฐ๐๐๐ฎ๐น ๐ช๐ฒ๐ฎ๐๐ต๐ฒ๐ฟ ๐๐ผ๐ป๐ฑ๐ถ๐๐ถ๐ผ๐ป
โ๏ธ ๐๐ฐ๐ฐ๐ถ๐ฑ๐ฒ๐ป๐๐
Any other report required to monitor the Construction Progress.
As-Built Drawings: Pipeline Construction Projects
The ‘As-Built’ Alignment Sheets shall also contain the following information:
โ
Pipeline profile
โ
Changes in wall thickness, materials
โ
Location and details of valves, insulating joints, fencing, etc.
โ
Location and details of buried services
โ
Location and details of road, water crossings, etc.
โ
Location and type of coating
โ
Location and type of weighting, anchoring
โ
Location and type of markers
โ
Location of further appurtenances (pig-signaller, etc.)
โ
Location of ROW and of pipeline with respect to ROW
โ
Location of CP test post, km pup piece
โ
Angle of bends and TP locations
โ
Type of soil ร Sand padding
โ
Actual pipe cover
โ
Type of road pavement
โ
Details of bank or plantation protection, number of insulators, seals, etc.
โ
Type of bends
โ
FOC Joint (Joint Pit) locations
โ
Section valve stations, if any
โ
Special fittings if any
โ
Special provisions such as protection/ identification slabs
๐ก ” โ๐โ๐ผ – ๐น๐๐๐” ๐ก
============================================
โ๏ธ Data relevant to the project and section thereof.
โ๏ธ Sequential number
โ๏ธ Length brought forward (for pipes and other materials)
โ๏ธ Length to bring forward (for pipes and other materials)
โ๏ธ Alignment sheet number and at least the location thereon of two welds on every page of the pipebook.
โ๏ธ Diameter of pipeline
โ๏ธ Length of each pipe
โ๏ธ Wall thickness
โ๏ธ Pipe number
โ๏ธ Identification number, certificate number
โ๏ธ Cut and re-numbered pipe ends
โ๏ธ Coating
โ๏ธ Date of stringing
โ๏ธ Date of welding
โ๏ธ Direction of working
โ๏ธ Weld number
โ๏ธ Welder number
โ๏ธ Type of welding, electrode, diameter
โ๏ธ Weld Treatment
โ๏ธ Equipment used for radiography
โ๏ธ Limits of valve stations, water crossings, etc.
โ๏ธ Test pressure, date and test (hydrostatic)
โ๏ธ Location of Cathodic Protection test posts shall be included and identified by GPS coordinates. ร Length of section per page in line separated in the pipes including field bends and factory bends and/ or other in-line fittings
โ๏ธ Length to bring forward (pipes and other materials)
โ๏ธ Length brought forward (pipes and other materials)