Pipeline Design & Construction

Pipeline Design & Construction Specifications

Pipeline Design Specifications:

The pipeline is designed in accordance with the relevant sections of ASME B31.4/B31.8, as applicable, supplemented by this document.

The pipeline is designed taking into consideration the design and operating conditions and requirements over its entire projected life cycle including final abandonment, the characteristics of the fluids to be transported, the pressure and temperature requirements, the mode of operations, the geographic location, and the environmental conditions.

๐——๐—˜๐—ฆ๐—œ๐—š๐—ก ๐—ฃ๐—›๐—œ๐—Ÿ๐—ข๐—ฆ๐—ข๐—ฃ๐—›๐—ฌ ๐—”๐—ก๐—— ๐—ข๐—ฃ๐—˜๐—ฅ๐—”๐—ง๐—œ๐—ก๐—š ๐—ฅ๐—˜๐—ค๐—จ๐—œ๐—ฅ๐—˜๐— ๐—˜๐—ก๐—ง๐—ฆ:

โ˜‘๏ธ ๐—ฃ๐—œ๐—ฃ๐—˜๐—Ÿ๐—œ๐—ก๐—˜ ๐——๐—˜๐—ฆ๐—œ๐—š๐—ก

โœ… Bends
โœ… Valves
โœ… Branch Connection and Fittings
โœ… Pigging of Buried Pipelines
โœ… Testing and Pre-Commissioning

โ˜‘๏ธ ๐——๐—˜๐—ฆ๐—œ๐—š๐—ก ๐——๐—”๐—ง๐—”

โœ… Design Life
โœ… General and Environment Data
โœ… Terrain and Geology
โœ… Pipeline Category

โ˜‘๏ธ ๐—ฅ๐—ข๐—จ๐—ง๐—œ๐—ก๐—š

โœ… Route Survey
โœ… Buried Pipelines
โœ… Aboveground Pipelines
โœ… Establishment of Location Classes

โ˜‘๏ธ ๐—ฃ๐—œ๐—ฃ๐—˜๐—Ÿ๐—œ๐—ก๐—˜ ๐— ๐—˜๐—–๐—›๐—”๐—ก๐—œ๐—–๐—”๐—Ÿ ๐——๐—˜๐—ฆ๐—œ๐—š๐—ก

โœ… Hoop Stress Design Factor
โœ… Pipeline Wall Thickness
โœ… Stress Analysis
โœ… Minimum Elastic Bend Radius
โœ… Road | Rig | Track Crossing Calculation
โœ… Additional Consideration
โœ… Pipeline Transition at Above ground โ€“ Below ground
โœ… Upheaval Buckling Analysis
โœ… On โ€“ bottom Stability of Pipelines
โœ… Pipeline Burial Depth

โ˜‘๏ธ ๐—ฃ๐—œ๐—ฃ๐—˜๐—Ÿ๐—œ๐—ก๐—˜ ๐—–๐—ฅ๐—ข๐—ฆ๐—ฆ๐—œ๐—ก๐—š๐—ฆ

โœ… Buried Crossing
โœ… Aboveground Crossing

โ˜‘๏ธ ๐—ฃ๐—œ๐—ฃ๐—˜๐—Ÿ๐—œ๐—ก๐—˜ ๐—–๐—ข๐— ๐—ฃ๐—ข๐—ก๐—˜๐—ก๐—ง

โœ… Line Pipe
โœ… Barred Tees
โœ… Flanges
โœ… Pig Signaler
โœ… Isolating Joints

โ˜‘๏ธ ๐—–๐—ข๐—ฅ๐—ฅ๐—ข๐—ฆ๐—œ๐—ข๐—ก ๐—ฃ๐—ฅ๐—ข๐—ง๐—˜๐—–๐—ง๐—œ๐—ข๐—ก

โœ… External Corrosion Coating Requirement
โœ… Field Joint Coating
โœ… Cathodic Protection
โœ… Internal Corrosion

โ˜‘๏ธ ๐—ฃ๐—œ๐—ฃ๐—˜๐—Ÿ๐—œ๐—ก๐—˜ ๐—ช๐—˜๐—Ÿ๐——๐—œ๐—ก๐—š & ๐—ก๐——๐—ง
โ˜‘๏ธ ๐—ฃ๐—ฅ๐—˜๐—ฆ๐—ฆ๐—จ๐—ฅ๐—˜ ๐—ง๐—˜๐—ฆ๐—ง๐—œ๐—ก๐—š
โ˜‘๏ธ ๐—ฃ๐—ฅ๐—˜-๐—–๐—ข๐— ๐— ๐—œ๐—ฆ๐—ฆ๐—œ๐—ข๐—ก๐—œ๐—ก๐—š
โ˜‘๏ธ ๐—ฃ๐—ฅ๐—˜๐—ฆ๐—˜๐—ฅ๐—ฉ๐—”๐—ง๐—œ๐—ข๐—ก ๐—ข๐—™ ๐—ฃ๐—œ๐—ฃ๐—˜๐—Ÿ๐—œ๐—ก๐—˜
โ˜‘๏ธ ๐—ฃ๐—œ๐—ฃ๐—˜๐—Ÿ๐—œ๐—ก๐—˜ ๐— ๐—”๐—ฅ๐—ž๐—˜๐—ฅ๐—ฆ
โ˜‘๏ธ ๐—ฃ๐—œ๐—˜๐—Ÿ๐—œ๐—ก๐—˜ ๐—•๐—”๐—ฆ๐—˜๐—Ÿ๐—œ๐—ก๐—˜ ๐—ฆ๐—จ๐—ฅ๐—ฉ๐—˜๐—ฌ

Pipeline Construction Specifications:

โ˜‘๏ธ ๐—˜๐—ก๐—š๐—œ๐—ก๐—˜๐—˜๐—ฅ๐—œ๐—ก๐—š & ๐—–๐—ข๐—ก๐—ฆ๐—ง๐—ฅ๐—จ๐—–๐—ง๐—œ๐—ข๐—ก ๐—–๐—ข๐—ก๐—ฆ๐—œ๐——๐—˜๐—ฅ๐—”๐—ง๐—œ๐—ข๐—ก

โ˜‘๏ธ ๐—ฅ๐—œ๐—š๐—›๐—ง โ€“ ๐—ข๐—™ โ€“ ๐—ช๐—”๐—ฌ | ๐—ฅ๐—ข๐—ช

โœ… Fence and Barriers
โœ… Removal of Debris
โœ… Grading of ROW
โœ… Provision of Diversions
โœ… Access to ROW

โ˜‘๏ธ ๐—›๐—”๐—ก๐——๐—Ÿ๐—œ๐—ก๐—š, ๐—›๐—”๐—จ๐—Ÿ๐—œ๐—ก๐—š, ๐—ฆ๐—ง๐—ฅ๐—œ๐—ก๐—š๐—œ๐—ก๐—š ๐—”๐—ก๐—— ๐—ฆ๐—ง๐—ข๐—ฅ๐—”๐—š๐—˜

โœ… Handling of Pipes and Fittings
โœ… Hauling and Stringing of Pipes
โœ… Damaged Pipes

โ˜‘๏ธ ๐—ง๐—ฅ๐—˜๐—ก๐—–๐—›๐—œ๐—ก๐—š

โœ… Trenching
โœ… Minimum Cover Requirements for Buried Pipeline
โœ… Extra Depth and Clearances
โœ… Protection of Underground Utilities
โœ… Grading, Padding and Finish Trench
โœ… Protection of Trench and Boring Pits

โ˜‘๏ธ ๐—ฃ๐—œ๐—ฃ๐—˜ ๐—•๐—˜๐—ก๐——๐—ฆ

โœ… Elastic Bends
โœ… Cold Field Bends
โœ… Miter Bends

โ˜‘๏ธ ๐—Ÿ๐—œ๐—ก๐—œ๐—ก๐—š ๐—จ๐—ฃ

โœ… Care of Pipe
โœ… Pipe Defect and Repair
โœ… Swabbing, Pipe Beveling and Cleaning Ends of Joints
โœ… Pipe Handling and Skid Supports
โœ… Night Caps

โ˜‘๏ธ ๐—ฆ๐—ฃ๐—˜๐—–๐—œ๐—”๐—Ÿ ๐—–๐—ฅ๐—ข๐—ฆ๐—ฆ๐—œ๐—ก๐—š | ๐—ฅ๐—ข๐—”๐—— ๐—–๐—ฅ๐—ข๐—ฆ๐—ฆ๐—œ๐—ก๐—š๐—ฆ

โœ… Minor | Graded Road | Track Crossings
โœ… Major Crossing and Asphalt Road Crossings
โœ… Buried Pipelines Crossing Other Buried Services

โ˜‘๏ธ ๐—ง๐—œ๐—˜ โ€“ ๐—œ๐—ก๐—ฆ

โœ… Tie โ€“ In to New Pipeline
โœ… Method for Tie โ€“ In of Pipeline
โœ… Tie โ€“ In of Pipelines in Trench
โœ… Tie โ€“ In of Aboveground Flowlines
โœ… Pipe Pups
โœ… Fitting and Equipments
โœ… Pressure Tested Sections

โ˜‘๏ธ ๐—ช๐—˜๐—Ÿ๐——๐—œ๐—ก๐—š | ๐—™๐—”๐—•๐—ฅ๐—œ๐—–๐—”๐—ง๐—œ๐—ข๐—ก ๐—ข๐—™ ๐—”๐—ฆ๐—ฆ๐— ๐—˜๐—•๐—Ÿ๐—œ๐—˜๐—ฆ

โœ… Fabrication and Testing
โœ… Small Diameter Ancillary Connections to Pipeline
โœ… Protection of the Pre-fabricated Assemblies

โ˜‘๏ธ ๐—™๐—œ๐—˜๐—Ÿ๐—— ๐—๐—ข๐—œ๐—ก๐—ง ๐—–๐—ข๐—”๐—ง๐—œ๐—ก๐—š

โœ… Care in Handling Coated Pipes
โœ… Holiday Detection and Damaged Coating Repair

โ˜‘๏ธ ๐—Ÿ๐—ข๐—ช๐—˜๐—ฅ๐—œ๐—ก๐—š โ€“ ๐—œ๐—ก ๐—ข๐—™ ๐—ฃ๐—œ๐—ฃ๐—˜

โœ… Method and Time of Lowering โ€“ In Pipe
โœ… Lowering โ€“ In of Slack Loops

โ˜‘๏ธ ๐—•๐—”๐—–๐—ž๐—™๐—œ๐—Ÿ๐—Ÿ๐—œ๐—ก๐—š

โœ… Selected Backfill Materials and Padding
โœ… Stabilization of Backfill

โ˜‘๏ธ ๐— ๐—”๐—ฅ๐—ž๐—˜๐—ฅ๐—ฆ

โ˜‘๏ธ ๐—–๐—”๐—ง๐—›๐—ข๐——๐—œ๐—– ๐—ฃ๐—ฅ๐—ข๐—ง๐—˜๐—–๐—ง๐—œ๐—ข๐—ก (๐—–๐—ฃ) | ๐—œ๐—ก๐—œ๐—ง๐—œ๐—”๐—Ÿ ๐—ฅ๐—˜๐—ค๐—จ๐—œ๐—ฅ๐—˜๐— ๐—˜๐—ก๐—ง

โœ… Baseline CP โ€“ Survey

โ˜‘๏ธ ๐—›๐—œ๐—š๐—› ๐—ฉ๐—ข๐—Ÿ๐—ง๐—”๐—š๐—˜ ๐—ฆ๐—ฌ๐—ง๐—˜๐— ๐—ฆ ๐—œ๐—ก๐—™๐—Ÿ๐—จ๐—˜๐—ก๐—–๐—˜๐—ฆ ๐——๐—จ๐—ฅ๐—œ๐—ก๐—š ๐—–๐—ข๐—ก๐—ฆ๐—ง๐—ฅ๐—จ๐—–๐—ง๐—œ๐—ข๐—ก

โœ… Additional Measures to Work

โ˜‘๏ธ ๐—Ÿ๐—œ๐— ๐—œ๐—ง๐—”๐—ง๐—œ๐—ข๐—ก ๐—ข๐—™ ๐—ช๐—ข๐—ฅ๐—ž ๐—ฆ๐—ฃ๐—ฅ๐—˜๐—”๐——
โ˜‘๏ธ ๐—›๐—ฌ๐——๐—ฅ๐—ข๐—ฆ๐—ง๐—”๐—ง๐—œ๐—– ๐—ง๐—˜๐—ฆ๐—ง ๐—ฃ๐—ฅ๐—ข๐—–๐—˜๐——๐—จ๐—ฅ๐—˜
โ˜‘๏ธ ๐—ฃ๐—œ๐—ฃ๐—˜๐—Ÿ๐—œ๐—ก๐—˜ ๐—ฃ๐—ฅ๐—˜ โ€“ ๐—–๐—ข๐— ๐— ๐—œ๐—ฆ๐—ฆ๐—œ๐—ข๐—ก๐—œ๐—ก๐—š ๐—”๐—ก๐—— ๐—–๐—ข๐— ๐— ๐—œ๐—ฆ๐—ฆ๐—œ๐—ข๐—ก๐—œ๐—ก๐—š

โ˜‘๏ธ ๐—–๐—ข๐—ก๐—ฆ๐—ง๐—ฅ๐—จ๐—–๐—ง๐—œ๐—ข๐—ก ๐—ข๐—™ ๐—”๐—•๐—ข๐—ฉ๐—˜ ๐—š๐—ฅ๐—ข๐—จ๐—ก๐—— ๐—œ๐—ก๐—ฆ๐—ง๐—”๐—Ÿ๐—Ÿ๐—”๐—ง๐—œ๐—ข๐—ก๐—ฆ

โœ… Painting of Above Ground Work
โœ… Extent of Coating at Interface Between U/G and A/G
โœ… Installation of Isolating Joints

โ˜‘๏ธ ๐—–๐—ข๐—ก๐—ฆ๐—ง๐—ฅ๐—จ๐—–๐—ง๐—œ๐—ข๐—œ๐—ก ๐——๐—ข๐—–๐—จ๐— ๐—˜๐—ก๐—ง๐—ฆ

โ˜‘๏ธ ๐—”๐—ฆ โ€“ ๐—•๐—จ๐—œ๐—Ÿ๐—ง ๐——๐—ฅ๐—”๐—ช๐—œ๐—ก๐—š ๐—”๐—ก๐—— ๐—ฃ๐—œ๐—ฃ๐—˜ ๐—•๐—ข๐—ข๐—ž

โœ… Equipment Nameplates
โœ… Pipe Book

โ˜‘๏ธ ๐— ๐—”๐—ง๐—˜๐—ฅ๐—œ๐—”๐—Ÿ ๐—œ๐——๐—˜๐—ก๐—ง๐—œ๐—™๐—œ๐—–๐—”๐—ง๐—œ๐—ข๐—ก
โ˜‘๏ธ ๐—ฃ๐—œ๐—ฃ๐—˜๐—Ÿ๐—œ๐—ก๐—˜ ๐—–๐—ข๐—ก๐—ฆ๐—ง๐—ฅ๐—จ๐—–๐—ง๐—œ๐—ข๐—ก ๐—–๐—›๐—˜๐—–๐—ž ๐—Ÿ๐—œ๐—ฆ๐—ง

Documentation: Pipeline Construction Projects

Prior to and during construction operations, following construction documentation for Company review/ approval.

โ˜‘๏ธ ๐—ฃ๐—ฒ๐—ฟ๐—บ๐—ถ๐˜ ๐—ฎ๐—ฝ๐—ฝ๐—น๐—ถ๐—ฐ๐—ฎ๐˜๐—ถ๐—ผ๐—ป๐˜€ ๐—ฎ๐—ป๐—ฑ/ ๐—ผ๐—ฟ ๐—ฎ๐—ฝ๐—ฝ๐—ฟ๐—ผ๐˜ƒ๐—ฎ๐—น๐˜€
โ˜‘๏ธ ๐—–๐—ฎ๐—น๐—ฐ๐˜‚๐—น๐—ฎ๐˜๐—ถ๐—ผ๐—ป๐˜€ ๐—ณ๐—ผ๐—ฟ ๐˜๐—ฒ๐—บ๐—ฝ๐—ผ๐—ฟ๐—ฎ๐—ฟ๐˜† ๐˜„๐—ผ๐—ฟ๐—ธ๐˜€, ๐—ฏ๐˜‚๐—ผ๐˜†๐—ฎ๐—ป๐—ฐ๐˜†, ๐—ฒ๐˜๐—ฐ.
โ˜‘๏ธ ๐—–๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป ๐—ฑ๐—ฟ๐—ฎ๐˜„๐—ถ๐—ป๐—ด๐˜€.

โ˜‘๏ธ ๐— ๐—ฒ๐˜๐—ต๐—ผ๐—ฑ ๐—ฆ๐˜๐—ฎ๐˜๐—ฒ๐—บ๐—ฒ๐—ป๐˜๐˜€ ๐—ณ๐—ผ๐—ฟ ๐˜๐—ต๐—ฒ ๐—ณ๐—ผ๐—น๐—น๐—ผ๐˜„๐—ถ๐—ป๐—ด ๐—ฎ๐—ฐ๐˜๐—ถ๐˜ƒ๐—ถ๐˜๐—ถ๐—ฒ๐˜€:
โœ… Pre-Construction Survey
โœ… Clearing and Grading of ROW
โœ… Pipe Handling, Storage, Hauling and Stringing
โœ… Cold Bending
โœ… Lining Up and Welding
โœ… Field Joint Coating
โœ… Holiday Detection
โœ… NDT
โœ… Upheaval/ Lateral buckling check
โœ… Trench Excavation and Padding
โœ… Pipeline Lowering-in
โœ… Backfilling and Berming
โœ… Tie-ins and Hot Taps
โœ… Special Crossings
โœ… Auger Bore
โœ… Thrust Bore
โœ… Pipework Fabrication and Installation of Appurtenances
โœ… Cathodic Protection Facilities
โœ… Management of water (obtaining water, re-use and disposal)
โœ… As-built Survey

โ˜‘๏ธ ๐—ฃ๐—ฟ๐—ผ๐—ฐ๐—ฒ๐—ฑ๐˜‚๐—ฟ๐—ฒ๐˜€ ๐—ณ๐—ผ๐—ฟ ๐˜๐—ต๐—ฒ ๐—ณ๐—ผ๐—น๐—น๐—ผ๐˜„๐—ถ๐—ป๐—ด ๐—ผ๐—ฝ๐—ฒ๐—ฟ๐—ฎ๐˜๐—ถ๐—ผ๐—ป๐˜€:
โœ… Padding ยง Backfilling ยง Welding & Inspection
โœ… Cleaning, Gauging and Hydrostatic Testing
โœ… Pre – Commissioning
โœ… Preservation of pipeline (if required by Company)
โœ… Commissioning

โ˜‘๏ธ ๐—ฅ๐—ฎ๐—ฑ๐—ถ๐—ผ๐—ด๐—ฟ๐—ฎ๐—ฝ๐—ต๐˜† ๐˜„๐—ฒ๐—น๐—ฑ ๐—บ๐—ฎ๐—ฝ๐˜€
โ˜‘๏ธ ๐—ฃ๐—ถ๐—ฝ๐—ฒ ๐—ฎ๐—ป๐—ฑ ๐˜„๐—ฒ๐—น๐—ฑ๐—ถ๐—ป๐—ด ๐—ฏ๐—ผ๐—ผ๐—ธ
โ˜‘๏ธ ๐—ก๐——๐—ง ๐—ฟ๐—ฒ๐—ฝ๐—ผ๐—ฟ๐˜๐˜€ (๐—ฅ๐—ฎ๐—ฑ๐—ถ๐—ผ๐—ด๐—ฟ๐—ฎ๐—ฝ๐—ต๐˜†, ๐—จ๐—น๐˜๐—ฟ๐—ฎ๐˜€๐—ผ๐—ป๐—ถ๐—ฐ ๐—ฎ๐—ป๐—ฑ ๐— ๐—ฃ๐—œ).
โ˜‘๏ธ ๐— ๐—ฎ๐˜๐—ฒ๐—ฟ๐—ถ๐—ฎ๐—น ๐˜๐—ฒ๐˜€๐˜ ๐—ฟ๐—ฒ๐˜€๐˜‚๐—น๐˜๐˜€ (๐—ฐ๐—ผ๐—ฎ๐˜๐—ถ๐—ป๐—ด, ๐˜„๐—ฒ๐—น๐—ฑ๐—ถ๐—ป๐—ด, ๐—ฝ๐—ฎ๐—ถ๐—ป๐˜๐—ถ๐—ป๐—ด, ๐—ฒ๐˜๐—ฐ.)
โ˜‘๏ธ ๐— ๐—ฎ๐˜๐—ฒ๐—ฟ๐—ถ๐—ฎ๐—น ๐—–๐—ฒ๐—ฟ๐˜๐—ถ๐—ณ๐—ถ๐—ฐ๐—ฎ๐˜๐—ฒ๐˜€, ๐— ๐—ฎ๐˜๐—ฒ๐—ฟ๐—ถ๐—ฎ๐—น ๐—ฅ๐—ฒ๐—ฐ๐—ฒ๐—ถ๐—ฝ๐˜๐˜€, ๐—ฒ๐˜๐—ฐ.
โ˜‘๏ธ ๐—ฉ๐—ฒ๐—ป๐—ฑ๐—ผ๐—ฟ ๐—ฑ๐—ฟ๐—ฎ๐˜„๐—ถ๐—ป๐—ด๐˜€
โ˜‘๏ธ ๐—–๐—ผ๐—บ๐—ฝ๐˜‚๐˜๐—ฒ๐—ฟ๐—ถ๐˜‡๐—ฒ๐—ฑ ๐—ฝ๐—ผ๐˜๐—ฒ๐—ป๐˜๐—ถ๐—ฎ๐—น ๐—น๐—ผ๐—ด๐—ด๐—ถ๐—ป๐—ด ๐˜๐—ฒ๐˜€๐˜ ๐—ฟ๐—ฒ๐˜€๐˜‚๐—น๐˜๐˜€
โ˜‘๏ธ ๐—ค๐—– ๐—ฅ๐—ฒ๐—น๐—ฒ๐—ฎ๐˜€๐—ฒ ๐—–๐—ฒ๐—ฟ๐˜๐—ถ๐—ณ๐—ถ๐—ฐ๐—ฎ๐˜๐—ฒ ๐—ณ๐—ผ๐—ฟ ๐—›๐˜†๐—ฑ๐—ฟ๐—ผ๐˜€๐˜๐—ฎ๐˜๐—ถ๐—ฐ ๐—ง๐—ฒ๐˜€๐˜.

In addition to weekly and monthly progress report as per the AGREEMENT requirements, Daily basis the following reports, but not limited to:

โ˜‘๏ธ ๐—ฆ๐—ฒ๐—ฝ๐—ฎ๐—ฟ๐—ฎ๐˜๐—ฒ ๐—ฃ๐—ฟ๐—ผ๐—ด๐—ฟ๐—ฒ๐˜€๐˜€ ๐—ฟ๐—ฒ๐—ฝ๐—ผ๐—ฟ๐˜ ๐—ผ๐—ณ ๐—ฎ๐—น๐—น ๐—ฐ๐—ฟ๐—ฒ๐˜„๐˜€.
โ˜‘๏ธ ๐——๐—ฎ๐—ถ๐—น๐˜† ๐˜„๐—ฒ๐—น๐—ฑ๐—ถ๐—ป๐—ด ๐—ฟ๐—ฒ๐˜€๐˜‚๐—น๐˜๐˜€, ๐—ฟ๐—ฒ๐—ฝ๐—ฎ๐—ถ๐—ฟ ๐—ฎ๐—ป๐—ฑ ๐—ก๐——๐—ง ๐—ฟ๐—ฒ๐˜€๐˜‚๐—น๐˜๐˜€
โ˜‘๏ธ ๐— ๐—ฎ๐˜๐—ฒ๐—ฟ๐—ถ๐—ฎ๐—น ๐—ฅ๐—ฒ๐—ฐ๐—ฒ๐—ถ๐—ฝ๐˜
โ˜‘๏ธ ๐——๐—ฎ๐—บ๐—ฎ๐—ด๐—ฒ๐˜€
โ˜‘๏ธ ๐—”๐—ฐ๐˜๐˜‚๐—ฎ๐—น ๐—ช๐—ฒ๐—ฎ๐˜๐—ต๐—ฒ๐—ฟ ๐—–๐—ผ๐—ป๐—ฑ๐—ถ๐˜๐—ถ๐—ผ๐—ป
โ˜‘๏ธ ๐—”๐—ฐ๐—ฐ๐—ถ๐—ฑ๐—ฒ๐—ป๐˜๐˜€

Any other report required to monitor the Construction Progress.

As-Built Drawings: Pipeline Construction Projects

The ‘As-Built’ Alignment Sheets shall also contain the following information:

โœ… Pipeline profile
โœ… Changes in wall thickness, materials
โœ… Location and details of valves, insulating joints, fencing, etc.
โœ… Location and details of buried services
โœ… Location and details of road, water crossings, etc.
โœ… Location and type of coating
โœ… Location and type of weighting, anchoring
โœ… Location and type of markers
โœ… Location of further appurtenances (pig-signaller, etc.)
โœ… Location of ROW and of pipeline with respect to ROW
โœ… Location of CP test post, km pup piece
โœ… Angle of bends and TP locations
โœ… Type of soil ร˜ Sand padding
โœ… Actual pipe cover
โœ… Type of road pavement
โœ… Details of bank or plantation protection, number of insulators, seals, etc.
โœ… Type of bends
โœ… FOC Joint (Joint Pit) locations
โœ… Section valve stations, if any
โœ… Special fittings if any
โœ… Special provisions such as protection/ identification slabs

๐Ÿ’ก ” โ„™๐•€โ„™๐”ผ – ๐”น๐•†๐•†๐•‚” ๐Ÿ’ก
============================================

โ˜‘๏ธ Data relevant to the project and section thereof.
โ˜‘๏ธ Sequential number
โ˜‘๏ธ Length brought forward (for pipes and other materials)
โ˜‘๏ธ Length to bring forward (for pipes and other materials)
โ˜‘๏ธ Alignment sheet number and at least the location thereon of two welds on every page of the pipebook.
โ˜‘๏ธ Diameter of pipeline
โ˜‘๏ธ Length of each pipe
โ˜‘๏ธ Wall thickness
โ˜‘๏ธ Pipe number
โ˜‘๏ธ Identification number, certificate number
โ˜‘๏ธ Cut and re-numbered pipe ends
โ˜‘๏ธ Coating
โ˜‘๏ธ Date of stringing
โ˜‘๏ธ Date of welding
โ˜‘๏ธ Direction of working
โ˜‘๏ธ Weld number
โ˜‘๏ธ Welder number
โ˜‘๏ธ Type of welding, electrode, diameter
โ˜‘๏ธ Weld Treatment
โ˜‘๏ธ Equipment used for radiography
โ˜‘๏ธ Limits of valve stations, water crossings, etc.
โ˜‘๏ธ Test pressure, date and test (hydrostatic)
โ˜‘๏ธ Location of Cathodic Protection test posts shall be included and identified by GPS coordinates. ร˜ Length of section per page in line separated in the pipes including field bends and factory bends and/ or other in-line fittings
โ˜‘๏ธ Length to bring forward (pipes and other materials)
โ˜‘๏ธ Length brought forward (pipes and other materials)